málaga tiec · calle kandinsky 1 · october 2026

What the contract does not say gets paid for later.

13–21 %lower design and construction cost with digital delivery properly in place (BCG)

TraceableSingle sourceMeasurable complianceClear accountability

Prepared for Student Experience by Avatar

Control of the project starts in the architect’s contract. If every requirement, technical and contractual, is in each party’s contract, everyone knows what they deliver, when, and how it is checked. In every phase, from the typical room to the whole portfolio.

Source: BCG, How technology is revolutionizing construction (2016)

the opportunity

The contract has to be adapted to BIM anyway. Do it once, for every project you build.

RequiredMálaga city council demands it
50–75 yearsof operation for an asset digitised from construction
3,600*beds in your Spanish pipeline
€300,000+*of rent for every month of delay

* Public readings, may be out of date: Iberian Property; Granada, 520 studios from €650/month at 95 % (studentexperience.com, October 2026).

An asset digitised from construction makes operation and maintenance cheaper for the whole operating period. On every development of your own, the same contract avoids renegotiating, redoing work and paying extras. Doing it well costs little more than doing the minimum. With Granada’s public figures; swap in your own. An example, not a forecast.

Change orders avoided–
Delay avoided–
Extras avoided–
BIM premium in contracts–
Return per € invested – – –

Prudent assumptions, undiscounted, before tax. Adapting the contract (€3,360) is separate. Delay is valued at lost rent only.

Public readings, may be out of date: Granada, 520 studios from €650/month (Student Experience, Oct 2026); plan for 5 residences (Iberian Property, 2021) and a 3,600-bed pipeline (Iberian Property). Everything else: example.

an example

In a residence, mistakes multiply. So do good decisions.

× 520rooms repeat every mistake
€156,000for a €300 clash in the typical room
€62,000per academic year, for ten miscounted beds
€0on skirting boards nobody should model

Example figures, using Granada’s public prices.

The typical room

A bathroom duct hits a beam and it is found on site. If the contract requires the typical room to be coordinated in the model with every trade before tendering, it is solved in the model.

The beds

The count comes from the model and matches the business plan (10 × €650 × 10 months × 95 %).

What gets modelled

Only what is measured, tendered or handed over. You pay for decisions, not modelling hours.

The site change

Switching 20 studios to a larger type: with the change in the model, quantities are objective and the change order closes in days.

The construction tender

Quantities from one source for every contractor: comparable bids and no claims for forgotten items.

The final handover

In the contractor’s contract it is part of the price. In the architect’s, it is billed as an extra or nobody delivers it.
your draft

We have reviewed your draft. Three points cost the most.

Paying twicewhat the contractor produces is asked of the architect
British stagesno basic design, detailed design or LPO
No dateno review period, no acceptance criterion
Construction detail and the as-built model are asked of the architect. In Spain the contractor produces them: left as is, it gets billed as an extra or ends in a dispute.
The architect will not know what to deliver for each permit.
Acceptance, and with it payment, stays open to argument.

On top of that, a residence’s rooms, beds and equipment are undefined. The full review comes with the engagement.

our offer for málaga

We adapt your architect’s contract to BIM. You sign it.

Scope: the BIM part of the document to tender the architect and designer. Done well, it shows across the asset’s whole lifecycle and every party.

€3,360fixed price + VAT, 48 hours
2 weeksbuilt on your draft
× 3one day of delay costs over three times this*
  1. 1Feasibility and concept
  2. 2Basic design and permit
  3. 3Detailed design
  4. 4Construction tender
  5. 5Construction
  6. 6Completion and LPO

One model, six phases, each with its owner. * About €10,700 of rent a day, on Granada’s public figures.

  1. 1Decisions on dataArchitect
  2. 2Earlier permitArchitect and engineers
  3. 3Fewer change ordersArchitect and engineers
  4. 4Comparable bidsArchitect
  5. 5Programme protectedContractor; site supervision integrates
  6. 6Paid for onceContractor and architect; site supervision verifies
From day one, the architect’s compliance is measured
10 daysto accept or reject each deliverable
0 bedsof difference between business plan and design
80 %*of deliverables accepted first time, without rework, per party
−⅓*change-order cost against a comparable project

* Targets estimated from previous housing projects; they depend on the context of each job. The calculator deliberately uses a more prudent assumption (15 %).

One model serves every phase, through to operation, if the contract bounds what is modelled and why. Code compliance checked in the model (CTE, LISTA and Málaga PGOU) and your shared platform: one source, approvals, minutes and every deliverable logged.

The hours breakdown, the sample clause and one full phase are in the PDFs: Fee proposal · Sample deliverable

why avatar

Digital transformation and BIM across the whole asset lifecycle. With every party.

Avatar · digital transformationAlejandro García · digital lead

2012BIM and data across the whole asset lifecycle
≈ 600,000 m²across design, construction, operation and scanning*
6parties: engineers, design studios, developers, contractors, operators and owners

We write requirements that can be priced and met, because we apply them on site.

On site≈ 140,000 m² as on-site BIM manager, through to the as-built model: a high-speed rail station, a 40,000 m² office refurbishment on one shared platform with 5–10 companies, housing and public buildings.
In operation≈ 150,000 m² of energy assets: 12 substations from scan to a model validated for SAP, with 0 linkage errors.
Scanned≈ 340,000 m² from point cloud to model: 50+ stores in 13 countries, offices, tunnels and existing buildings.
Housing800+ homes as BIM manager for Vía Célere, Madrid’s EMVS and Neinor.
Developer requirementsBIM plan written to the developer’s specification and compliance control through design and construction: 67 homes for Neinor in Fuentelucha (Alcobendas) and 33 in Valdemoro.
LanguagesWe work in Spanish and English, with your team, your architects and contractors.

* Areas estimated from Avatar’s projects; one project may count in several lines.

next step

We already have your draft. In 2 weeks, the contract adapted to BIM.

Ready to sign with the architect: every requirement with its owner, its deadline and its acceptance criterion.

50 % on acceptance · 50 % on delivery · one round of adjustments · offer valid 30 days

Alejandro García · digital lead · Avatar

€3,360 + VAT, fixed price. Accepting it by email is enough; the round of adjustments follows your review. If you can share your design guide, we tailor the requirements to your product and your room types. Then, if you want: compliance control through design and construction and the same contract as the standard for all your projects in Spain. If you commission the roll-out within the following 12 months, these 48 hours are deducted.