What the contract does not say gets paid for later.

13–21 %lower design and construction cost with digital delivery properly in place (BCG)

TraceableSingle sourceMeasurable complianceClear accountability

Prepared for Student Experience by Avatar

Control of the project starts in the architect’s contract. If every requirement, technical and contractual, is in each party’s contract, everyone knows what they deliver, when, and how it is checked. In every phase, from the typical room to the whole portfolio.

Source: BCG, How technology is revolutionizing construction (2016)

the opportunity

The contract has to be adapted to BIM anyway. Do it once, for every project you build.

RequiredMálaga city council demands it
50–75 yearsof operation for an asset digitised from construction
3,600*beds in your Spanish pipeline
€300,000+*of rent for every month of delay

* Public readings, may be out of date: Iberian Property; Granada, 520 studios from €650/month at 95 % (studentexperience.com, October 2026).

An asset digitised from construction makes operation and maintenance cheaper for the whole operating period. On every development of your own, the same contract avoids renegotiating, redoing work and paying extras. Doing it well costs little more than doing the minimum. With Granada’s public figures; swap in your own. An example, not a forecast.

Change orders avoided–
Delay avoided–
Extras avoided–
BIM premium in contracts–
Return per € invested – – –

Prudent assumptions, undiscounted, before tax. Adapting the contract (€3,360) is separate. Delay is valued at lost rent only.

Public readings, may be out of date: Granada, 520 studios from €650/month (Student Experience, Oct 2026); plan for 5 residences (Iberian Property, 2021) and a 3,600-bed pipeline (Iberian Property). Everything else: example.

an example

In a residence, mistakes multiply. So do good decisions.

× 520rooms repeat every mistake
€156,000for a €300 clash in the typical room
€62,000per academic year, for ten miscounted beds
€0on skirting boards nobody should model

Example figures, using Granada’s public prices.

The typical room

A bathroom duct hits a beam and it is found on site. If the contract requires the typical room to be coordinated in the model with every trade before tendering, it is solved in the model.

The beds

The count comes from the model and matches the business plan (10 × €650 × 10 months × 95 %).

What gets modelled

Only what is measured, tendered or handed over. You pay for decisions, not modelling hours.

The site change

Switching 20 studios to a larger type: with the change in the model, quantities are objective and the change order closes in days.

The construction tender

Quantities from one source for every contractor: comparable bids and no claims for forgotten items.

The final handover

In the contractor’s contract it is part of the price. In the architect’s, it is billed as an extra or nobody delivers it.
your draft

We have reviewed your draft. Three points cost the most.

Paying twicewhat the contractor produces is asked of the architect
British stagesno basic design, detailed design or LPO
No dateno review period, no acceptance criterion
Construction detail and the as-built model are asked of the architect. In Spain the contractor produces them: left as is, it gets billed as an extra or ends in a dispute.
The architect will not know what to deliver for each permit.
Acceptance, and with it payment, stays open to argument.

On top of that, a residence’s rooms, beds and equipment are undefined. The full review comes with the engagement.

our offer for málaga

We adapt your architect’s contract to BIM. You sign it.

€3,360fixed price + VAT, 48 hours
2 weeksbuilt on your draft
× 3one day of delay costs over three times this*
  1. 1Feasibility and concept
  2. 2Basic design and permit
  3. 3Detailed design
  4. 4Construction tender
  5. 5Construction
  6. 6Completion and LPO

One model, six phases, each with its owner. * About €10,700 of rent a day, on Granada’s public figures.

  1. 1 · Feasibility and conceptDecisions on dataAreas, beds and comparable options from the model.Architect
  2. 2 · Basic design and permitEarlier permitBuilding code (CTE) and planning rules (LISTA, Málaga PGOU) checked in the model.Architect and engineers
  3. 3 · Detailed designFewer change ordersCoordinated with every trade before tendering.Architect and engineers
  4. 4 · Construction tenderComparable bidsQuantities from the model, the same for everyone.Architect
  5. 5 · ConstructionProgramme protectedChanges in the model and installation detail.Contractor; site supervision integrates
  6. 6 · Completion and LPOPaid for onceDocuments for the occupancy licence and an as-built model ready for operation.Contractor and architect; site supervision verifies
From day one, who complies is measured in every contract
10 daysto accept or reject each deliverable
0 bedsof difference between business plan and design
80 %*of deliverables accepted first time, without rework, per party
−⅓*change-order cost against a comparable project

* Targets estimated from previous housing projects; they depend on the context of each job. The calculator deliberately uses a more prudent assumption (15 %).

Each requirement belongs to one party and one phase, but the model serves them all, through to operation, if the contract bounds what is modelled and why. If not, it serves no one. The contract says who produces it, what data it carries and how it is accepted, and sets your shared platform: one source instead of lost emails, approval workflows, meeting minutes and every deliverable logged with date, author and result.

Sample clause

"The model will be updated at the end of construction."

"The contractor delivers the as-built model, with data for every piece of equipment, before handover. Site supervision checks it within 10 days against the checklist. It is a condition for signing the certificate of completion."

Optional: 10 hours of support negotiating with the architect, €700. Breakdown · Sample (PDF)

why avatar

We write requirements teams can price and meet, because we apply them on site.

800+homes as BIM manager
75,000 m²of multi-family housing
420homes in the Plan Vive competition

Vía Célere · EMVS Madrid · Neinor

Multi-family housingSchemes of 33 to 138 homes in the Madrid region.
Developer requirementsBIM plan written to the developer’s specification and compliance checked through design and construction: 67 homes for Neinor in Fuentelucha (Alcobendas) and 33 in Valdemoro.
CompetitionsFour concept designs for Neinor, leading a team of five.
Construction and handoverSite supervision support and the as-built model for 33 homes in Arroyomolinos.
HotelsRefurbishments in Madrid and Ávila, from surveying the existing building to the detailed design quantities.
  • A technical lead accountable for the BIM adaptation paying off in your business.
  • Requirements written for Spanish phases, permits and contractors.
  • We know both sides of the contract: what is asked and what it costs to deliver.
  • We work in Spanish and English, with your team, your architects and contractors.
next step

We already have your draft. In 2 weeks, the contract adapted to BIM.

Ready to sign with the architect: every requirement with its owner, its deadline and its acceptance criterion.

50 % on acceptance · 50 % on delivery · one round of adjustments · offer valid 30 days

Alejandro García Nicolás · Technical lead · Avatar

€3,360 + VAT, fixed price. Accepting it by email is enough; the round of adjustments follows your review. If you can share your design guide, we tailor the requirements to your product and your room types. Then, if you want: compliance control through design and construction and the same contract as the standard for all your projects in Spain. If you commission the roll-out within the following 12 months, these 48 hours are deducted.